The short answer

Build your rate from a burdened, billable crew hour, then price each stop by the minutes on site plus the minutes driving to it, because route density is where the margin is.

The takeaway. Price from the full cost of a billable crew hour divided by one minus your margin, and sell the street, not the town: tighter routes are the cheapest margin.

Play the interactive lesson

Written for landscapers and lawn care routes, grounds maintenance contractors, tree services and arborists, irrigation, hardscape and fencing installers, and landscape firms that sell snow and ice work, in any US state.

The short version

  1. Find the full cost of a billable hour.Add payroll taxes, workers' comp and liability insurance to the wage, then divide by the share of paid hours you actually bill.
  2. Divide by one minus your margin.Add trucks, equipment and overhead per crew hour. Then divide: say, by 0.85 for a 15% margin. A 15% markup is only a 13% margin.
  3. Price each stop by site and drive minutes.Fill the streets you already mow before taking stops across town, and price any out-of-route stop for its extra drive, there and back.

It is tempting to set lawn and landscape rates from what competitors charge, or from a wage with a bit added. Both miss two costs: the burden on every hour of payroll, and the paid time nobody bills for, such as the drive, the loading and the shop. Price from the full cost of an hour you can bill, then look hard at the minutes between stops.

Step one: the burdened labor hour

Start with the hourly wage and add the burden: FICA, federal and state unemployment, workers' comp at your class code rate, and liability insurance charged on payroll. Then allow for paid time that is not billable. The figures below are indicative assumptions, not market rates.

Cost of one billable labor hour (indicative)
Crew member's wage$20
Burden at an assumed 18%: FICA 7.65%, unemployment 3.00%, workers' comp class 0042 at $6.00 per $100 of payroll, liability 1.35%$3.60
Loaded hourly cost$23.60
Cost per billable hour, with 15% of paid time non-billable$27.76

$23.60 / 0.85

Step two: the crew hour

A 3-person crew hour at a 15% net margin (indicative)
Labor for 3 crew members$83.29
Trucks, trailer and mowers$22
Overhead: $180,000 a year over 6,000 billable crew hours$30
Full cost per crew hour$135.29
Price per crew hour for a 15% net margin$159.17

$135.29 / 0.85, worked on the unrounded cost; $53.06 a man-hour

Divide, do not add. In the worked example a 15% markup charges $155.59 a crew hour, only a 13.0% margin; a 15% margin needs $159.17, a 17.6% markup.

Step three: price the stop, then tighten the route

For mowing, the cost of a stop on your route is the minutes on site plus the minutes driving to it. A stop off your route also costs the drive back to the route, because the crew is paid for both. Cut the drive and the same crew fits more stops into a day at the same price.

One stop on a 2-person mowing route (indicative)
Crew time: 15 minutes on site plus 10 minutes driving, at an assumed $70 an hour$29.17
Overhead per stop$8
Full cost per stop$37.17
Price at a 20% margin$46.46

$37.17 / 0.8, rounded to $47 a stop

AvoidTaking a new mowing account across town at the same $47 a stop as the streets you already serve, as in the worked example.
Do this insteadFilling the streets you already serve first, with door hangers, and pricing any out-of-route stop for its extra drive minutes, there and back.

In the worked example, cutting the drive from 10 minutes to 5 lifts a 9-hour day from 21 stops ($987) to 27 ($1,269), with the same crew and the same truck.

Measure, then price

  • Measure crews by task and equipment, in acres, linear or square feet, or cubic yards per hour or day, and review those rates each fall.
  • Price installs from a measured takeoff: material waste, production-based labor, equipment, disposal, and a stated contingency for rock, roots and utilities.
  • No published price survey for landscaping is reliable enough to benchmark against, so test your rates against your own won and lost bids by city and service.
  • Track revenue per crew hour, gross margin by service line and bid win rate, so you can see which work pays.

Asked in Greymill

Example question and answer from Cash & Profit
You
My 2-person mowing crew costs me about $70 an hour. A normal stop is 15 minutes on site plus 10 driving, $8 overhead, and I charge $47. New client across town wants $47 too, but they're 25 minutes off my route. Worth it?
Cash & Profit
Not at $47. Counting the drive there and back, that stop costs you about $83.83, so you'd lose about $36.83 a visit.

The stop across town:
Crew time: 15 on site + 25 there + 25 back to your route = 65 minutes at $70 an hour = $75.83
Overhead: $8
Cost: $83.83
Price for a 20% margin: $83.83 / 0.80 = $104.79, so quote $105

On your route: $37.17 cost / 0.80 = $46.46, so your $47 works there.

The cheapest margin is a tighter route. Cut the drive from 10 minutes to 5 and a 9-hour day goes from 21 stops ($987) to 27 ($1,269).
Same crew, same truck.

Want me to price the rest of your route this way?

Play this demo in the Academy

Ask it about your own business

Paste this into Greymill with your own figures, and Cash & Profit works it through for your business.

Your question

I run a landscaping or gardening business in [state], in the US. My crew members earn [wage], my workers' comp class code and rate are [code and rate], my trucks and equipment cost about [amount] an hour, and my overhead is [amount] a year over about [billable crew hours]. Work out my full cost per billable crew hour and the price for a [margin] margin, then price my mowing stops from [minutes on site] and [minutes driving] and show me what tightening the route is worth.

Start free trialHow it works7 days free with every specialist. No card needed.

More for landscaping and gardening in the US

Open the interactive lesson · Every landscaping and gardening lesson · What Greymill knows about the trade

Sources

The primary sources behind this lesson, checked Oct 2026.

  1. Social Security and Medicare withholding rates (Pricing, crew costs and route density: the math)
  2. FOMC calendar and statement (Pricing, crew costs and route density: the math)
  3. OEWS occupation profile 37-3011; OFLC wage search (Pricing, crew costs and route density: the math)
  4. October 28, 2026 statement; FOMC calendar 2026 (federalreserve.gov/monetarypolicy/fomccalendars.htm) (Pricing, crew costs and route density: the math)
  5. 16 CFR part 465 (Winning work, growth and exit)
  6. 47 CFR 64.1200(a)(2) (Winning work, growth and exit)
  7. 41 U.S.C. 6702; 40 U.S.C. 3142 (Winning work, growth and exit)
  8. IRC 453(i) (Winning work, growth and exit)
  9. IRC 1202 as amended (Winning work, growth and exit)

Ready to try Greymill?

Sixteen specialists who already know your trade and your country, sharing one memory of your business.

7 days free with every specialist. No card needed.

Continue with GoogleTry the demo, no sign-up