Written for general builders, groundworkers, carpenters and joiners, roofers, plasterers, bricklayers and kitchen and bathroom fitters in the UK, from one-van firms to small main contractors.
The short version
- Ask first: homeowner or business?A homeowner job runs on consumer law. A job for a business runs on the Construction Act. The paperwork differs.
- Give cancellation paperwork before a home signing.Hand over the cancellation information and model form first. Start inside the cancellation period only if they ask in writing.
- Strike or cap risky subcontract clauses.Strike pay-when-paid, where you are paid only once they are. Cap liquidated damages, indemnities and retention before signing for a main contractor.
The question that changes everything: is the client a homeowner having work done on the home they live in, or a business? The Construction Act does not apply to a homeowner's work on their own home (HGCRA 1996 s.106). Consumer law applies instead. So the paperwork that protects you is different on each side.
Homeowner jobs
Cancellation rights when the contract is signed at the client's home
If the contract is signed in the client's home, or straight after meeting them away from your premises, give the pre-contract information and the cancellation information, with the model cancellation form, in writing before the client is bound. The cancellation period is 14 days from the day the contract is made. Leave the information out and the period runs on for up to 12 months, and a client who then cancels pays nothing for work done in that period. Failing to give the cancellation information is a criminal offence. Start inside the 14 days only at the client's express request on a durable medium. Contracts to build a new building are outside most of these rules. As of Oct 2026.
Consumer Contracts (Information, Cancellation and Additional Charges) Regulations 2013 (SI 2013/3134) regs 6, 10, 13, 19, 30, 31 and 36(6)
Without the paperwork, a client who cancels may owe nothing for the work done and you have committed an offence. With it, the right ends after 14 days.
- Agree every variation in writing, with the price, before you do the work. If you do not, the argument becomes what a reasonable price would have been.
- No statute caps a domestic deposit in England. Take what covers the materials you are ordering for that job, not a large sum at signing.
- What you said or wrote that the client relied on binds you, and you cannot exclude your duty of reasonable care and skill (Consumer Rights Act 2015 ss.49, 50 and 57).
Subcontracts and work for main contractors
Business-to-business construction contracts sit on top of the Construction Act's payment rules, whichever form is used: the JCT 2024 Edition is the current suite (the 2016 forms remain on older jobs), and NEC4 is used on public and infrastructure work. Before you sign, look for these:
- Pay-when-paid or pay-when-certified: ineffective, so strike it.
- Set-off or contra charges without notice: any deduction still needs a valid pay less notice by the contract deadline.
- Retention released only when the whole project completes: ask for release on completion of your own package, capped at the JCT default of 3%, and diarise the dates. As of Sep 2026.
- Liquidated damages at the main contract rate, or uncapped: ask for a cap and a rate in proportion to your package.
- Back-to-back terms from a main contract you have not seen: ask for the relevant parts before signing.
- Notices as conditions precedent with short time limits: diarise and notify in writing every time, or lose the claim.
- Fitness for purpose on design: strike it or limit it to reasonable skill and care, because professional indemnity insurance does not cover it.
- Uncapped indemnities and consequential loss: limit to direct loss and cap at the subcontract sum or your insurance limit.
- Insurance levels above what you hold: price the extra premium or negotiate the level.
- Collateral warranties, deeds and third-party rights: they extend your exposure to 12 years and to new parties, so price and cap them.
What the courts and the Act have already decided
Liquidated damages stand unless they are out of all proportion to a legitimate interest. A design obligation can be read as a guarantee of the outcome. A pay-when-paid clause may operate only within the insolvency exception. A clause making you pay the other side's adjudication costs whatever the outcome is ineffective unless agreed after the notice of adjudication.
Cavendish Square Holding v Makdessi; ParkingEye v Beavis [2015] UKSC 67; MT Hojgaard v E.ON [2017] UKSC 59; HGCRA 1996 ss.108A and 113
Above the cap you may recover only a reasonable sum for the work, not the price you agreed. A letter of intent should cap the spend, set an end date and say which terms apply.
After the job: how long you stay liable
Limitation and defects on homes (England and Wales)
A claim on a simple contract generally runs 6 years from the breach, which is not automatically the date of practical completion, and a claim on a deed 12 years. Homes run longer. Anyone taking on work for or in connection with providing a dwelling, including a conversion or enlargement, owes a duty to whoever ordered it and to every later owner, and it cannot be contracted out of. Claims under that duty that arose before 28 June 2022 now have 30 years from completion, and later ones 15 years. The High Court can make an associated company jointly liable where it is just and equitable, so closing a company and trading on through another does not escape it. As of Oct 2026.
Limitation Act 1980 ss.4B, 5 and 8; Defective Premises Act 1972 ss.1 and 6(3); Building Safety Act 2022 ss.130 and 135
Keep the job file on every home (drawings, specifications, photos, certificates and product data) for at least 15 years, keep run-off cover after you retire or close the company, and notify your insurer before you reply to any defects letter. Scotland and Northern Ireland have their own time limits.
Asked in Greymill
Before she signs, give her in writing:
The pre-contract information
The cancellation information
The model cancellation form
Monday is inside the 14 days, so start then only if she asks you to, in writing.
What catches builders out: leave the cancellation information out and her right to cancel runs on for up to 12 months. Cancel in that time and she pays nothing for the work done. Failing to give it is also a criminal offence.
Picture £9,000 of work in three weeks, then a cancellation.
I can draft the cancellation paperwork and her early-start request before tomorrow.
Ask it about your own business
Paste this into Greymill with your own figures, and Contracts & Disputes works it through for your business.
I run a construction or building business in the UK. I have been sent [a subcontract, a homeowner contract or a letter of intent] for [describe the job] worth [amount], from [a homeowner or a main contractor]. [Paste the payment, retention, damages, design, insurance and termination clauses.] Tell me which clauses to strike or cap, what to ask for instead, and what paperwork I must give the client before they sign.
More for construction and building in the UK
- Setting a day rate that still pays after holidays, rain days and the vanWork out what an hour of labour really costs you, then price for the margin you want, not a markup that looks like it.Read the lesson
- Busy on three jobs and still short for Friday's wagesWhy builders run out of cash while making a profit, and the weekly forecast, applications and retention ledger that close the gap.Read the lesson
- Quoting the wrong VAT rate on a building job and paying it out of my marginAs of Oct 2026, building work can be 0%, 5% or 20% VAT depending on what is being built, and the rate has to be settled before you quote.Read the lesson
- Starting a job before building control, party wall notices and the phase plan are sortedNo general licence is needed to trade as a builder in the UK, but building control, party walls, CDM and asbestos all have to be dealt with before the first day on site.Read the lesson
- My regular labour-only subbie looks more like an employee every yearCIS registration does not make someone self-employed. How to tell, what it costs if HMRC disagrees, and the checks builders skip when they take people on.Read the lesson
- Proving to homeowners, main contractors and councils that I am a safe pair of handsEach kind of client checks different proof: reviews and trust marks for homeowners, accreditation for main contractors, registration for public tenders.Read the lesson
- The main contractor has knocked thousands off my application without a proper noticeOn a construction contract a deduction needs a valid pay less notice served in time. Without one, the notified sum is due in full, and you have suspension, interest and adjudication behind you.Read the lesson
Open the interactive lesson · Every construction and building lesson · What Greymill knows about the trade
Sources
The primary sources behind this lesson, checked Oct 2026.
- reg 5 (Domestic clients: consumer contracts, deposits and reviews)
- regs 10, 13; Schs 2, 3 (Domestic clients: consumer contracts, deposits and reviews)
- reg 30(3) (Domestic clients: consumer contracts, deposits and reviews)
- reg 31 (Domestic clients: consumer contracts, deposits and reviews)
- reg 19 (Domestic clients: consumer contracts, deposits and reviews)
- reg 6(1)(c) (Domestic clients: consumer contracts, deposits and reviews)
- s.111 (Contract red flags)
- s.108A (Contract red flags)
- s.8 (Contract red flags)
- Contract particulars default (Contract red flags)
- NEC4 ECC (Contract forms, RETENTIONS, insolvency and disputes)
- Cavendish Square Holding v Makdessi; ParkingEye v Beavis [2015] UKSC 67, para 32 (Contract forms, RETENTIONS, insolvency and disputes)
- Triple Point Technology v PTT [2021] UKSC 29 (Contract forms, RETENTIONS, insolvency and disputes)
- MT Hojgaard v E.ON [2017] UKSC 59 (Contract forms, RETENTIONS, insolvency and disputes)
- CPR 26.9; Simple Procedure (Scotland) (Contract forms, RETENTIONS, insolvency and disputes)
- s.1(1); s.6(3) (Defects, limitation and the building safety act)
- s.135; Limitation Act s.4B (Defects, limitation and the building safety act)
- s.134(1) inserting DPA s.2A; s.134(2); "S. 134 in force at 28.6.2022, see s. 170(3)(b)" (Defects, limitation and the building safety act)
- s.130(1) to (3) (Defects, limitation and the building safety act)
- New Homes Quality Code (Defects, limitation and the building safety act)
- 1973 Act ss.6, 7, 11 as amended by the Prescription (Scotland) Act 2018 ss.3 to 5, commenced 1 June 2022 (commencement regulations SSI 2022) (Defects, limitation and the building safety act)
- regs 19, 31, 36 (Hard cases: payment, contracts and defects)
- s.108(2)(a) (Hard cases: payment, contracts and defects)
- s.113 (Hard cases: payment, contracts and defects)
- regs 2 and 12; Sch 7 para 2 (Pitfalls that embarrass the product)
- s.106(1)(a) (Pitfalls that embarrass the product)
- s.61 (Pitfalls that embarrass the product)
- Commencement and the Central Digital Platform (Pitfalls that embarrass the product)
- Autoclenz v Belcher [2011] UKSC 41; Ready Mixed Concrete [1968] 2 QB 497 (Pitfalls that embarrass the product)
- [2018] EWCA Civ 2448 (Pitfalls that embarrass the product)
- Building Act 1984 s.7 (approved documents: status in proceedings) (Read the user, law by nation and adjacent regimes)
- Building Regulations etc. (Amendment) (Wales); transfer of functions 31 Dec 2011 (SI 2009/3019) (Read the user, law by nation and adjacent regimes)
- Building (Scotland) Act 2003 ss.9, 17 (Read the user, law by nation and adjacent regimes)
- Prescription and Limitation (Scotland) Act 1973 s.6 (Read the user, law by nation and adjacent regimes)
- Scheme for Construction Contracts (Scotland) Regulations 1998 (Read the user, law by nation and adjacent regimes)
- SI 1997/274 (N.I. 1); amended by the 2011 Act (Read the user, law by nation and adjacent regimes)